Edit existing purge schedules

To edit an existing purge schedule

Note : Users with 'Application Architect' or 'Admin' roles only can modify purge schedules.

  1. Go to Release Automation > Release Pipeline.
  2. Select the design type (topology or sequenced) from the drop-down list in the left pane. (Topology Designs is selected by default).
  3. Select the application design and version which contains the purge schedule you want to edit.
  4. Click the gear icon corresponding to the lifecycle stage which contains the purge schedule you want to edit, and select Configure Purge Schedule.
  5. Click the gear icon corresponding to the purge schedule you want to edit and select Edit.
  6. Make the required changes and click Save.
  7. Click Done to exit the Configure Purge Schedule for <lifecycle stage> screen.