Searching the Help
To search for information in the Help, type a word or phrase in the Search box. When you enter a group of words, OR is inferred. You can use Boolean operators to refine your search.
Results returned are case insensitive. However, results ranking takes case into account and assigns higher scores to case matches. Therefore, a search for "cats" followed by a search for "Cats" would return the same number of Help topics, but the order in which the topics are listed would be different.
Search for | Example | Results |
---|---|---|
A single word | cat
|
Topics that contain the word "cat". You will also find its grammatical variations, such as "cats". |
A phrase. You can specify that the search results contain a specific phrase. |
"cat food" (quotation marks) |
Topics that contain the literal phrase "cat food" and all its grammatical variations. Without the quotation marks, the query is equivalent to specifying an OR operator, which finds topics with one of the individual words instead of the phrase. |
Search for | Operator | Example |
---|---|---|
Two or more words in the same topic |
|
|
Either word in a topic |
|
|
Topics that do not contain a specific word or phrase |
|
|
Topics that contain one string and do not contain another | ^ (caret) |
cat ^ mouse
|
A combination of search types | ( ) parentheses |
|
Schedule Data Push Jobs
To schedule job executions directly from a data push job:
-
Log in to UCMDB as an administrator.
-
Go to Data Flow Management > Integration Studio. UCMDB displays a list of existing integration points.
-
Select the integration point you created for the UCMDB - Service Anywhere.
-
Select the push job.
-
Click Edit Integration Job .
Note UCMDB allows you to define two different schedules for two types of data push: Changes Synchronization and All Data Synchronization. It is recommended to use the Changes Synchronization schedule to only synchronize changes and avoid synchronizing the entire set of data each time.
-
Define a schedule for Changes Sync.
-
Click on the Changes Synchronization tab.
-
Select the Scheduler enabled option.
-
Select the scheduling options you want to use.
-
-
Click the All Data Synchronization tab and select the scheduling options you want to use.
-
Click OK.
-
Save the integration point.
Note The out-of-the-box default job schedule is for a Changes Synchronization data push every 2 hours.