How to reschedule a change

You can reschedule a change in the Change Calendar (Build > Change > Calendar) in one of the following ways:

Drag the change representation

If you want to reschedule the change, without increasing or decreasing the duration:

  1. Click the change representation in the main pane, and drag it to the new time.

  2. Click Save icon Save.

If you want to increase or decrease the duration of the change:

  1. Click the resize handle at the appropriate end of the change representation, and drag it to its new time.

  2. Click Save icon Save.

Note As you drag the change representation, a tooltip is displayed with:

  • The scheduled start and end times.
  • The downtime start and end times, if relevant.

For each scale view (Day, Week, and Month) there is a minimum display size for the change representation. If the change representation is at the minimum, you can reschedule the change by dragging it, but you cannot resize it. You must, instead, use the scheduling dialog.

Edit the scheduling dialog

  1. Click the change representation.

  2. Click the drop-down arrow that is displayed to the right of the change representation. The Schedule details dialog box is displayed. Do one of the following:

    • Edit the dialog box as appropriate, and click Save icon Save.

    • Click View additional available windows. A list of available windows is displayed. Then:

      • Select a suitable window to schedule the change and click Save icon Save.

      • Or, click Left arrow to return to the Schedule details dialog box.