Use > Build > Change Management > Change Calendar > Use the Change Calendar > Reschedule downtime for a change

How to reschedule downtime for a change

You can reschedule downtime for a change in the Change Calendar (Build > Change > Calendar) in one of the following ways:

Drag the representation

If you want to reschedule the downtime, without increasing or decreasing the duration:

  1. Click the downtime icon (inside the change representation) in the main pane, and drag it to the new time.

  2. Click Save icon Save.

If you want to increase or decrease the duration of the downtime:

  1. Point to the appropriate end of the downtime icon until the resize handle is displayed.

  2. Drag the downtime icon to its new time.

  3. Click Save icon Save.

Note

  • As you drag the downtime, a tooltip is displayed with (a) the scheduled start and end times, and (b) the downtime start and end times.

  • You cannot drag the downtime beyond the scheduled start or end time of the change.

  • For each scale view (Day, Week, and Month) there is a minimum display size for the change representation. If the change representation is at the minimum, you can reschedule the change by dragging it, but you cannot resize it. You must, instead, use the scheduling dialog.

Edit the scheduling dialog

  1. Click the change representation.

  2. Click the drop-down arrow that is displayed to the right of the change representation. A dialog box with scheduled start and end dates and times is displayed.

  3. Edit the dialog box as appropriate.

  4. Click Save icon Save.