Test the link

Follow these steps to test the link:

Note

  1. A mandatory field (in either SM and QC) does not accept a null value. Synchronization may fail if a mandatory field is mapped to a field that can be null.
  2. The following sample steps are for your reference only. The exact steps required on your system may differ significantly. The phase in which the QC Integration tab appears may be different on your system.

  1. Save the configuration (an integrity check is automatically run).
  2. Click Enable Link.
  3. Create a defect and set Synchronize with SM Problem to Y.

    Note In ALM 11, the Synchronize with SM Problem field and the Problem ID field reside on the Details tab of the Defect form.

  4. Synchronize.

  5. View the Problem in SM.

  6. View the Defect in QC.

    Note In ALM 11, the Synchronize with SM Problem field and the Problem ID field reside on the Details tab of the Defect form.